KUCHING, Oct 13: The Public Works Department (JKR) Sarawak has proposed upgrading the approximately 13-kilometre route from Nyelong Bridge in Sarikei to Red Bridge in Bintangor into a four-lane carriageway, including the construction of two new bridges.

Deputy Minister of Public Health and Housing Datuk Dr Penguang Manggil said the proposed project would involve upgrading and widening the existing two-lane road, alongside the construction of the two bridges, their approaches and other supporting infrastructure.

“The estimated project cost would only be determined after JKR Sarawak completed the detailed design and cost estimation for the proposed works,” he said inresponding to Repok assemblyman Dato Sri Huang Tiong Sii during the question-and-answer session at the Sarawak Legislative Assembly (DUNS) sitting today.