Trans-Borneo Railway still awaits decisions on funding, routes despite completed study
By Amanda L KUCHING, Oct 14: The federal government is reviewing the completed feasibility study for the proposed Trans-Borneo Railway before deciding on its priority routes, funding arrangements and implementation plans. Deputy Minister of Transport (Aviation and Roads) Datuk Dr Jerip Susil said the feasibility study for the proposed Trans-Borneo Railway, undertaken by the Ministry of Transport Malaysia, was completed on Aug 7, 2026, with the final report subsequently presented to the…
The federal government is reviewing a completed feasibility study for the Trans-Borneo Railway to determine priority routes, funding, and implementation plans.
Feasibility study for Trans-Borneo Railway was completed on Aug 7, 2026.
Final report presented to the project’s Steering Committee for consideration.
Government is evaluating technical, financial, and environmental aspects of the project.
Summarised automatically by AI from the original article by DayakDaily. AI can make mistakes, so check the original for details.
KUCHING, Oct 14: The federal government is reviewing the completed feasibility study for the proposed Trans-Borneo Railway before deciding on its priority routes, funding arrangements and implementation plans.
Deputy Minister of Transport (Aviation and Roads) Datuk Dr Jerip Susil said the feasibility study for the proposed Trans-Borneo Railway, undertaken by the Ministry of Transport Malaysia, was completed on Aug 7, 2026, with the final report subsequently presented to the project’s Steering Committee for consideration.
Responding to a question from Batu Kitang assemblyman Dato Ir Lo Khere Chiang during the Sarawak Legislative Assembly (DUS) sitting today, he said the final report had been presented to the project’s Steering Committee for consideration.
Read the full story on DayakDailyThat's the opening of the story. The full piece is published by DayakDaily.
By Karen Bong KUCHING, Oct 14: Padungan assemblyman Chong Chieng Jen has urged the Sarawak government not to proceed with the proposed RM10 billion new Kuching International…
By Dayangku Hidayatul KUCHING, Oct 14: Daro assemblyman Dr Safiee Ahmad has proposed transforming the 547-hectare Pulau Tun Ahmad Zaidi Nature Reserve into an ecotourism…
By Amanda L KUCHING, Oct 14: The construction of SMK Balingian, which has been categorised as a “sick project”, needs urgent intervention to get it back on track, says Balingian…
AI summary Ba'Kelalan assemblyman Baru Bian calls for urgent safety reforms in Sarawak's flying doctor services after a helicopter tragedy, stressing the need for better protocols and road…