Following reports of the East Coast Rail Link (ECRL) Gombak station’s lack of a pedestrian bridge connecting it to the Terminal Bersepadu Gombak (TBG) – which is a hub for express buses and is physically connected to the Gombak LRT station – despite operations scheduled to start in December, Malaysia Rail Link (MRL) has issued a statement to address concerns.

MRL, the ECRL’s project owner, says that pedestrian access and integration of public transport at the ECRL Gombak station was taken into account in the planning. The company takes note of the concerns raised by the public, especially on the passenger journey between the ECRL Gombak station, the LRT Gombak station and TBG.

The company says that an elevated and covered pedestrian walkway is being built to connect the ECRL station to the Gombak LRT station, and the plan also includes a walkway to TBG. This permanent structure is expected to be completed in March 2027. In the meantime, MRL will provide a temporary walkway to allow passengers to move between stations when the ECRL starts operating in December.