ALOR SETAR, Nov 5 (Bernama) -- Ferrotec Group’s newly opened second plant in Kulim is expected to generate more than 1,000 new high-value jobs for skilled Malaysian professionals, including engineers, technicians and production specialists.
Ferrotec Group Opens Second Kulim Plant, Creating Over 1,000 High-Value Jobs
Ferrotec Group, MIDA, Kulim, Semiconductor, Manufa
Key takeaways
Ferrotec Group opened its second Kulim plant on Oct 28, adding over 1,000 high‑value jobs and nearly 1 million sq ft of automated manufacturing space, bringing total investment to about RM1.9 billion.
- The new plant features more than 700 CNC machines, IoT sensors and autonomous guided vehicles.
- Ferrotec’s first Kulim facility started in January 2024 after an investment of over RM900 million.
- The expansion reflects confidence in Malaysia’s semiconductor demand and ecosystem.
Summarised automatically by AI from the original article by Bernama. AI can make mistakes, so check the original for details.
Also reported by The Sun
Story details
- Published
- Section
- news
- Format
- Article
- Original
- bernama.com ↗
Related reporting
5 stories on this topic from 4 sources, oldest first.
- Paul Tan's Automotive News Proton cars to get Google built-in from second half of 2027, along with all Geely Group brand vehicles
- Berita Harian Ferrotec labur RM1.9 bilion buka kilang kedua di Kulim
- Bernama Ferrotec Group Opens Second Kulim Plant, Creating Over 1,000 High-Value Jobs (this story)



%2Ffile%2Fpublisher-c1a3f893382d2b2f8a9aa22a654d9c97%2F2026%2F02%2Fcf0667319e5a2e446ce8e866bd734b5f.jpg&w=480&output=webp&q=85&we)