GUA MUSANG, Oct 25 (Bernama) -- A temporary detour at FT008 Section 205.556 along the Gua Musang-Kota Bharu road near the Kesedar Ethnobotanical Recreation Park here was opened to light vehicles at noon today.
General : FT008 Detour In Gua Musang Opens To Light Vehicles
JKR, sinkhole, detour, Gua Musang-Kota Bharu road,
Key takeaways
A temporary Bailey bridge detour for light vehicles opened on the FT008 road near Kesedar Park in Gua Musang on October 25. The detour bypasses an eight-metre sinkhole that forced the road's closure on October 10.
- The detour at FT008 Section 205.556 is restricted to light vehicles only.
- Heavy vehicles are advised to use alternative routes to avoid the construction site.
- The road closed on October 10 due to an eight-metre deep sinkhole.
Summarised automatically by AI from the original article by Bernama. AI can make mistakes, so check the original for details.
Story details
- Published
- Section
- news
- Format
- Article
- Original
- bernama.com ↗
Related reporting
2 stories on this topic from 2 sources, oldest first.
- Bernama General : FT008 Detour In Gua Musang Opens To Light Vehicles (this story)

