The MRT Kajang Line is now operating normally after a train was stuck at the Taman Suntex station this morning. Rapid KL says that operations returned to normal at 7.58 am after the stuck train was removed from the line and taken to the depot for inspection.

The train operator says that with that, the alternative train service that was activated to bridge the gap has stopped. Train frequency will be adjusted in stages to ensure that operations run according to schedule – expect longer waiting times. The technical team continues to monitor system stability and operation smoothness.

To ensure the safety and smooth flow of passengers, auxiliary police officers and station staff will continue to be at the affected stations to assist and guide passengers.